Skip to content

buildingdemolitioncontractorsinhyderabad.com

House-building will not return to pre-pandemic levels until 2029/30

Posted on October 30, 2025 by parashuramerugadhindla@gmail.com

With house-building targets out of reach, the construction lobby is calling for stimuli from the chancellor.

Read Full Article: The Construction Index

Posted in Civil Engineering

Post navigation

Previous: Land deal paves way for £3.9bn Hertfordshire data campus
Next: Water, water everywhere

Related Posts

  • Civil Engineering

6 Insights about the Current State of the Green Construction Industry

  • parashuramerugadhindla@gmail.com
  • December 22, 2025
  • 6 min read
  • 0

The post 6 Insights about the Current State of the Green Construction Industry appeared first […]

  • Civil Engineering

Sizewell C financial close unlocks full-scale construction

  • parashuramerugadhindla@gmail.com
  • November 4, 2025
  • 2 min read
  • 0

Full-scale construction of the planned Sizewell C nuclear project can now proceed after a £5.5bn […]

  • Civil Engineering

Morgan Sindall upgrades profit forecast again as fit out boom shows no sign of slowing down

  • parashuramerugadhindla@gmail.com
  • October 3, 2025
  • 1 min read
  • 0

Firm says division’s performance has ‘strengthened significantly’

  • Civil Engineering

University Turns to Emerge X HPWH for Sustainable, Code-Compliant Hot Water System

  • parashuramerugadhindla@gmail.com
  • December 9, 2025
  • 1 min read
  • 0

The split design enabled crane-assist installation on a top-floor mechanical room while meeting ambitious energy […]

Copyright © 2025 buildingdemolitioncontractorsinhyderabad.com Theme: Popular Blog By Adore Themes.