Skip to content

buildingdemolitioncontractorsinhyderabad.com

HS2 weathers the challenges of green tunnel works

Posted on December 10, 2025 by parashuramerugadhindla@gmail.com

EKFB has faced – and overcome – a plethora of problems while constructing a pair of tunnels for HS2 in Northamptonshire

The post HS2 weathers the challenges of green tunnel works appeared first on Construction News.

Posted in Civil Engineering

Post navigation

Previous: Tender prices edge up but margin pressure persists, RLB warns
Next: Decarbonisation must become business-as-usual for tradespeople

Related Posts

  • Civil Engineering

Mastering Precast Staircase Design: Insights into Complex Geometries and Connection Challenges

  • parashuramerugadhindla@gmail.com
  • October 2, 2025
  • 7 min read
  • 0

In the world of modern construction, precast staircases are rapidly gaining popularity for their efficiency, […]

  • Civil Engineering

Hydro International adds strength options to its Stormbloc® Optimum range of below ground storage

  • parashuramerugadhindla@gmail.com
  • October 27, 2025
  • 2 min read
  • 0

Flood prevention and stormwater management solutions specialist, Hydro International has announced a further extension to its […]

  • Civil Engineering

National Timber Group collapses with over 560 jobs axed

  • parashuramerugadhindla@gmail.com
  • November 26, 2025
  • 2 min read
  • 0

The country’s biggest independent timber supplier, National Timber Group, has collapsed into administration with 561 […]

  • Civil Engineering

Swinerton, Timberlab top out mass timber factory

  • parashuramerugadhindla@gmail.com
  • December 3, 2025
  • 1 min read
  • 0

Scheduled for completion in 2027, the 192,000-square-foot facility, made with glue-laminated timber, will be one […]

Copyright © 2025 buildingdemolitioncontractorsinhyderabad.com Theme: Popular Blog By Adore Themes.