The traditional bidding process in construction is widely used, and for good reason: it’s familiar and reliable. However, it’s not the most efficient delivery method for smaller construction jobs like repair, maintenance, and renovation. Because these projects move fast and don’t always justify a full bidding cycle, it makes more sense to use a procurement method called job order contracting (JOC).
JOC can be a go-to approach for owners who need construction work done quickly and consistently, without the headaches of traditional bidding.
In this guide, we break down the essentials of job order contracting and how it works.
What is job order contracting?
Job order contracting is a project procurement and delivery method that enables owners to complete a steady stream of small- to midsize construction projects under a single long-term contract. Instead of running a full-fledged bidding process for every repair or renovation, teams use job order contracting with preset pricing and a trusted contractor to get work started faster and keep costs predictable.
Purpose of job order contracting
The main reason owners use JOC is to streamline how small construction needs are handled. Rather than going through a full procurement cycle every time a project comes up, JOC gives teams a fast, structured way to scope work, confirm pricing, and get moving.
Organizations leverage JOC to stay on top of maintenance and keep facilities in good working order without slowing down operations.
Ideal use cases
Job order contracting works best for entities that deal with ongoing repair and renovation work across multiple sites. It shines when projects are repetitive, time-sensitive, or too small to justify a complete bid process.
That’s why JOC is often used for:
- Building repairs
- Facility upgrades
- Routine maintenance
- Small renovations
- Multi-site improvements
- Emergency response work (e.g., storm damage repairs)
It’s a strong fit for government and public facilities like schools, municipalities, and hospitals. In some cases, large property portfolios that need consistent, reliable construction support also benefit from JOC.
Key components of a JOC contract
The JOC contract serves as the master agreement that manages an indefinite quantity of recurring minor construction jobs over a specified period. Here are the key components of the agreement.
Unit price book (UPB)
The unit price book (UPB) serves as the pricing foundation for a JOC contract. It lists thousands of construction tasks with preset, standardized costs. When a project comes up, the owner and contractor pull from the UPB to build the estimate. This keeps pricing transparent and consistent, and it saves time because no one has to negotiate every line item from scratch.
Some of the features of the UPB include:
- Detailed line items for common construction tasks
- Current local costs, updated regularly to reflect market trends
- Typically organized using the Construction Specifications Institute (CSI) MasterFormat for consistency
Adjustment factor
The adjustment factor (or coefficient) accounts for the contractor’s indirect costs and profit, which are intentionally excluded from the UPB’s bare unit prices.
The adjustment factor is a multiplier applied to the UPB. It accounts for real-world conditions like local labor rates, materials, overhead, and project complexity. Instead of creating a new budget for each job, the contractor applies the agreed-upon factor to UPB pricing. This keeps costs predictable and gives both sides a simple way to align on pricing early in the process.
The final price for each task is calculated as:
Unit Price (for UPB) x Quantity x Adjustment Factor
Scope of work
The scope of work outlines what the contractor will complete for each job order. It includes:
- Tasks
- Materials
- Timelines
- Special requirements
Having a clear scope is critical because it keeps both teams aligned and helps the project move forward with clear expectations. JOC involves many small projects, so getting the scope right upfront will ensure everything stays on track.
Contract term
The construction contract term defines how long the JOC agreement will remain in place—usually 1 to 5 years—with a maximum dollar value for the contract term.
During that time, owners can issue as many job orders as needed within the contract’s limits. A longer term builds continuity and lets the contractor learn the facility and deliver work more efficiently over time. It also saves the owner from having to repeatedly rebid similar work.
How JOC works
What does job order contracting look like in practice? Here’s a look at each step of the process.
Invitation to bid
A JOC program kicks off with bid solicitation. An invitation to bid is where the owner invites contractors to bid on the JOC contract, submitting their adjustment factors.
Master agreement setup
A master agreement is set between the owner and the selected contractor. This contract outlines pricing, expectations, and the time frame for the contract.
Once the master agreement is in place, the owner can issue job orders whenever work comes up. That way, teams have a ready-to-go framework, and projects can start faster and with less back-and-forth.
Scope meetings
When a new project surfaces, the owner and contractor meet to walk the site and talk through needs, expectations, etc. These scope meetings help both sides understand the conditions, required tasks, and any constraints they should plan for.
Here, the contractor takes notes, asks questions, and gathers details needed to build the estimate. A good scope meeting prevents surprises later and sets the tone for a smoother job order.
Task order and development
After the scope meeting, the contractor uses the UPB and adjustment factor to create a detailed task order. This document outlines the exact work to be performed, the associated UPB line items, quantities, timelines, and any special considerations.
On their end, the owner reviews the task order and confirms that the scope and pricing match expectations. In some cases, the owner may also request revisions.
In any event, this step translates the initial discussion into a clear, actionable plan.
Approval and execution
Once everyone agrees on the task order, the owner issues formal approval, and the contractor begins the project. Multiple task orders can be managed concurrently under the same JOC contract.
Since pricing and workflows are already defined through the JOC contract, it’s easier for teams to move forward with the job.
Once the crew completes the work, the contractor documents everything and submits a final construction invoice based on the approved task order.
Closeout
As with any project, construction closeout occurs once the work is complete and both teams confirm it meets the agreed scope.
At this stage, the contractor submits final documentation, including as-builts, warranties, photos, and any required inspections.
Once they review the documents, the owner can sign off on the complete project and process the final payment based on the approved task order.
Advantages of JOC
Job order contracting gives owners a faster, more predictable way to manage recurring construction work. Consider the following.
Faster project delivery
JOC speeds up project delivery because teams don’t have to start from zero every time a new job pops up. The pricing, contract terms, and workflows are already set so that owners can issue task orders quickly and contractors can get to work sooner. This makes a big difference for repairs and upgrades that can’t wait. Rather than sitting in a long bid cycle, projects move forward as soon as the scope is agreed on.
Reduced administrative burden
Traditional bidding requires longer review and approval times, not to mention more paperwork. JOC cuts much of that out. Once the master agreement is in place, each job only needs a scoped task order and a quick review.
Predictable pricing and cost control
Since teams rely on UPB rates and an agreed-upon adjustment factor, JOC costs are transparent and consistent across projects. This leads to better budgeting and forecasting, and there’s less room for guesswork.
Stronger owner-contractor relationships
JOC is all about repeat work and long-term collaboration, and this gives owners and contractors the chance to get to know each other’s expectations and processes. Contractors learn the facility’s needs, while owners gain a partner they can call on for reliable work.
Over time, JOC creates stronger owner-contractor relationships because both parties become accustomed to their workflows. Teams are then able to communicate better, and work flows smoothly.
Disadvantages of JOC
On the flip side, job order contracting isn’t for everyone or every project. Issues can arise if it’s not implemented correctly. Here’s what to be aware of.
Requires high organizational discipline
JOC works best when teams follow the process closely. Whether it’s getting the right people involved early or making sure scopes are on point, owners need strong internal coordination to map out projects correctly. And when projects are underway, teams must keep approvals and documentation moving. Without that discipline, even a well-built JOC program can slow down or create confusion.
Potential for cost overruns if the scope isn’t well managed
Because JOC relies on task orders built from preset pricing, teams need to make sure that the scope reflects what’s actually happening on site. They must accurately assess site conditions, resources, and effort level to avoid surprises once work begins. If not, contractors may need to revise quantities or add tasks later. Early collaboration and detailed scope development are essential.
Complex subcontractor coordination
Many JOC projects still require specialty trades, which means subcontractor coordination matters just as much as it does in traditional construction. If the contractor doesn’t manage subs well, schedules can slip, and communication can break down. This becomes even more challenging when jobs happen across multiple facilities. A strong JOC contractor should have trusted subs, clear scheduling practices, and a plan to handle issues quickly.
Best practices for managing JOC programs
Looking to implement job order contracting? Here are some best practices to consider.
Maintain clear workflows and documentation
Since job order contracting consists of multiple small jobs, it’s all too easy to lose track of details or let tasks fall through the cracks. As such, having standardized workflows and clear documentation keeps everything organized and easy to follow. For best results, use templates, task orders, and site notes.
These practices create a clear record of decisions, changes, and completed work, ensuring everyone stays on the same page throughout the agreement.
Use project management software for task tracking
Tracking multiple small projects can be challenging, especially if you don’t have robust tools in place. That’s why you should equip teams with digital solutions like construction project management software, so owners and contractors have a single place to monitor timelines, approvals, budgets, and documentation.
Autodesk Build, for example, connects teams, workflows, and data in a single platform, making it easier to stay aligned as work progresses.

Communicate regularly with stakeholders
Just because a project is “small” doesn’t mean it can run without tight coordination.
Owners, GCs, and subs still need to communicate openly and regularly to keep jobs on track. Regular check-ins and status reports can go a long way in preventing misunderstandings. These touchpoints also build trust, which makes it easier to address issues quickly and keep work moving in the right direction.
Review and update UPB annually
The unit price book only works when pricing reflects current market conditions. So, review the UPB at least once a year to ensure costs are accurate and reflect market conditions. Doing so can help prevent disputes, reduce change orders, and make budgeting more reliable across the entire JOC program.
Examples of job order contracting in action
Here are a few real-world scenarios that show how JOC can work day to day.
University campus repairs: multiple small projects completed under one contract
Let’s say you have a large university with dozens of buildings spread across campus, and each semester brings a wave of maintenance needs. A lecture hall needs new lighting. A residence hall has a leaking roof. Several classrooms need fresh paint and minor drywall repairs. None of these projects are big enough to justify a lengthy bidding process, but they still need quick attention so students and staff aren’t disrupted.
With a JOC contract in place, the facilities team submits job orders as issues arise. The contractor walks each site, confirms the scope, and builds estimates directly from the UPB.
Since pricing is already set and the adjustment factor has been agreed on, approvals don’t take too long.
Over the course of a year, the university completes dozens of small projects under the same contract. Plus, the contractor becomes more familiar with the campus over time, enabling them to be even more efficient, and the university benefits from consistent, high-quality work.
Municipal emergency work: quick response to urgent infrastructure needs.
Next, let’s look at a government example. A city’s public works department handles everything from street repairs to water line issues. When emergencies happen, time is everything. A water main might break after a freeze. A sidewalk could shift and create a public hazard. Storms might damage traffic signals or flood drainage systems. These situations require immediate action, not weeks of procurement and bidding.
With JOC in place, the city can issue an emergency job order the same day the problem is reported. The contractor visits the site, confirms the tasks and quantities, and uses the UPB to lock in pricing.
This approach lets the city fix safety hazards fast and keep essential services running. It also reduces administrative burden during high-pressure situations, when teams already have a lot on their plates.
Throughout the course of the agreement, the contractor learns the city’s infrastructure and can respond even faster. The result? The city gets a reliable system that keeps residents safe and minimizes downtime when emergencies hit.
Final words
When you have steady needs for maintenance, repairs, or upgrades, job order contracting will make life a whole lot easier. Since pricing and expectations are sorted out upfront, teams can get a move on projects faster and avoid the constant back and forth that slows work down. When it’s set up well, JOC gives owners and contractors a smoother way to manage small projects and keep facilities in good shape. As construction needs evolve, JOC stands out as a proven, adaptable solution for delivering value and building lasting partnerships.