Skip to content

buildingdemolitioncontractorsinhyderabad.com

McCarthy uses prefab components on $185M ASU facility

Posted on November 20, 2025 by parashuramerugadhindla@gmail.com

The structure is Arizona State University’s first to employ various offsite processes, which include multi-trade corridor racks and prefabricated enclosure panels.

Posted in Civil Engineering

Post navigation

Previous: Costain lands biodiversity studies at two UK airports
Next: McKinstry grows bigger in Texas

Related Posts

  • Civil Engineering

IIM Indore Recruitment 2025 for Civil Engineer | 10-12-2025

  • parashuramerugadhindla@gmail.com
  • November 26, 2025
  • 1 min read
  • 0

IIM Indore Recruitment 2025 for Civil Engineer | 10-12-2025 Apply now for IIM Indore recruitment […]

  • Civil Engineering

Why Fall is the Perfect Time to Build (or plan) Your Custom Home with Colby Construction

  • parashuramerugadhindla@gmail.com
  • October 3, 2025
  • 4 min read
  • 0

As the leaves turn and temperatures gradually drop, many might think that construction activity slows […]

  • Civil Engineering

The Importance of Retrofitting Structures: RREN’s Expert Approach

  • parashuramerugadhindla@gmail.com
  • October 2, 2025
  • 6 min read
  • 0

 Published by Tom Jose, Senior Engineer – D&E| RREN Consultants & Contractors Pvt. Ltd. | […]

  • Civil Engineering

Government Engineering Jobs | Application Deadlines [22nd Nov 2025 Updated]

  • parashuramerugadhindla@gmail.com
  • November 22, 2025
  • 1 min read
  • 0

Government Engineering Jobs | Application Deadlines [22nd Nov 2025 Updated] The Latest Government Engineering Jobs […]

Copyright © 2025 buildingdemolitioncontractorsinhyderabad.com Theme: Popular Blog By Adore Themes.